Cape Cod Hospital

Cape Cod Hospital
1997
Case Study
Cape Cod Hospital
Hyannis, MA
THE PROBLEM
The primary problem was water hammer noise from poor steam trap design and application. Steam was also venting from condensate receivers resulting in back pressure in the steam system as well as wasted energy.
THE SOLUTION

Conservation Solutions Corporation completed a detailed study of the steam “system” including the steam traps throughout the Cape Cod Hospital and recommended a long-term solution to the on-going steam trap problems the Hospital was experiencing. The SteamLoc® Orifice Steam Traps in conjunction with some high performance mechanical steam traps were installed over a period of 6 years. Conservation Solutions Corporation staff provided steam “system” troubleshooting recommendations to specific Hospital staff problems. Steam venting from the condensate receiver was stopped. Over 317 SteamLoc® steam traps were installed, including equipment with varying loads such as Heat Exchangers, Air Handlers, Radiators and Domestic Hot Water Heaters.

THE RESULTS
  • Eliminated Water Hammer Noise
  • Eliminated Venting Steam for the Long Term
  • Significantly Reduced make-up Water Requirement
  • Reduced Chemical Treatment Costs
  • Reduced Energy Costs