
Conservation Solutions Corporation completed a detailed study of the steam “system” including the steam traps throughout the Cape Cod Hospital and recommended a long-term solution to the on-going steam trap problems the Hospital was experiencing. The SteamLoc® Orifice Steam Traps in conjunction with some high performance mechanical steam traps were installed over a period of 6 years. Conservation Solutions Corporation staff provided steam “system” troubleshooting recommendations to specific Hospital staff problems. Steam venting from the condensate receiver was stopped. Over 317 SteamLoc® steam traps were installed, including equipment with varying loads such as Heat Exchangers, Air Handlers, Radiators and Domestic Hot Water Heaters.
THE RESULTS